Type X Catchment Cavitray 43.5-70 Long Lead Flashing


Solid DPC petheleyne, AA.
Lead flashing BS EN 12588.
Specify pitch, lead length, handing and whether external skin is brickwork. Water drip bars eliminate underbase track-back.
Correct mortar bedding depth is also established as bar dimensions harmonise with front of tray section to aid stability and mortar integrity.
Integral cavitray sealing flap links with upper tray.
Feature on the tray end upstand arrests horizontal tracking at this vulnerable point.
Adjusts for cavities from 50mm up to 140mm.

£10.63

Download datasheet Fitting instructions

Use

Preformed DPC cavitray complete with an attached ready-shaped lead flashing to form a stepped cavity DPC and flashing at the abutment of a pitched roof with a cavity wall. The Type X is the only “high performance” classified cavitray for gable abutments, and offers the builder numerous benefits. Ideal for new-build applications.

Introduction

Every stepped and every staggered gable abutment must be so constructed to prevent rainwater and dampness from penetrating below the abutting roof line. This is because the external skin changes status below the roof line and becomes an internal skin. The system fulfils three basic requirements: 1 It prevents dampness from penetrating below the critical stepped roof line. 2 It externally weatherproofs and flashes the physical roof/masonry intersection. 3 It also prevents the inside skin from becoming damp. The high performance Type X cavitray speeds up operations on site and ensures a good and known quality of build. Type X trays are handed, to suit left hand slopes and right hand slopes. Every tray is a self-contained unit, with its own ready-shaped lead flashing attached. Select long leads to dress directly over tiles, or alternatively short leads to dress over the upstand of a secret gutter or soaker. Unlike other systems, the Type X has an adjustable cavity upstand so it always suits the actual cavity width and is therefore always compatible. Just bed in position and flush point as the external skin is raised. At a later date the lead flashing may be dressed.

Data

Solid DPC petheleyne, AA.
Lead flashing BS EN 12588.
Specify pitch, lead length, handing and whether external skin is brickwork. Water drip bars eliminate underbase track-back.
Correct mortar bedding depth is also established as bar dimensions harmonise with front of tray section to aid stability and mortar integrity.
Integral cavitray sealing flap links with upper tray.
Feature on the tray end upstand arrests horizontal tracking at this vulnerable point.
Adjusts for cavities from 50mm up to 160mm.
Allow one tray per course up each slope, Stipulate left hand or right hand trays. Also whether long lead or short lead flashings. The bottom of each slope usually starts with a catchment tray (or angle if on a corner). The top usually requires a ridge tray.

Select

Type B1 size, Type B1 Insulated, Caviroll DPC 100mm wide, Caviroll DPC 150mm wide, Caviroll DPC 225mm wide, Caviroll DPC 300mm wide, Caviroll DPC 450mm wide, Caviroll DPC 600mm wide, Caviroll DPC 900mm wide, Type E End Left, Type E End Right, Standard 450mm straight length, Type E Universal External Angle 220mm x 220mm, Type E Universal Internal Angle, Standard 450mm straight length (25 number), Type F75 Flashing unit, Type F25 Mini Flashing unit, Type FB14 Box profile Flashing unit, Type FB16 Box profile Flashing unit, F75 IRON Flashing Unit, Type F75 Ridge Flashing unit, Type G Internal angle x No lead With Lip, Type G External angle x No lead With Lip, Type G Internal angle x No lead with rake strip, Type G External angle x No lead with rake strip, Type G 675mm x No Lead No Lip, Type G 450mm x No Lead No Lip, Type G 675mm length x No lead With Lip, Type G 450mm length x No lead With Lip, Type G 675mm length x No lead with rake strip, Type G 450mm length x No lead with rake strip, Type G 900mm length x No lead With Lip, Type G 900mm Length x No lead No Lip, Type G 900mm length x No lead with rake strip, Type G 450mm length x 150mm lead, Type G 675mm length x 150mm lead, Type G External angle x 150mm lead, Type G Internal angle x 150mm lead, Type G 450mm length x 300mm lead, Type G 900mm length x 150mm lead, Type G External angle x 300mm lead, Type G Internal angle x 300mm lead, Type G 675mm length x 300mm lead, Type G 900mm length x 300mm lead, Type J1 size, Type J1 size (Insulated), Type J2 Size, Type J2 size (Insulated), Type K 600mm diameter, Type L adjustable stopend, Type L90 stopend, Type L adjustable stopend (50 number), Type L90 stopend (50 number), Coneslate code 3 lead, Coneslate code 4 lead, Coneslate code 5 lead, Type M length, Type M length (10 number), External Angle 450 x 450mm, Internal Angle 150 x 150mm, Type P 2400mm length, External Angle 300 x 300mm, Internal Angle 150 x 150mm, Type Q 2400mm length, Beak Weep Clear, Beak Weep Clear (50 number), Small Weepvent Beige, Small Weepvent Clear, Small Weepvent Grey, Small Weepvent Terracotta, Small Weepvent Beige (100 number), Small Weepvent Clear (100 number), Small Weepvent Grey (100 number), Small Weepvent Terracotta (100 number), Type W Weepvent Grey, Type W Weepvent White, Type W Weepvent Clear, Type W Weepvent Terracotta, Type W Weepvent Beige, Type W Weepvent Brown, Type W Weepvent Black, Type W Weep Extension Duct, Type W Weepvent Clear (50 number), Type W Weepvent Terracotta (50 number), Type W Weepvent Beige (50 number), Type W Weepvent Brown (50 number), Type W Weepvent Black (50 number), Type W Weepvent Grey (50 number), Type W Weepvent White (50 number), Type W Weep Extension Duct (50 number), Euroweep-vent Beige, Euroweep-vent Black, Euroweep-vent Brown, Euroweep-vent Grey, Euroweep-vent Terracotta, Euroweep-vent White, Euroweep-vent Terracotta (50 number), Euroweep-vent Grey (50 number), Euroweep-vent Brown (50 number), Euroweep-vent Black (50 number), Euroweep-vent Beige (50 number), Euroweep-vent White (50 number), Intermediate Right Hand, Intermediate Left Hand, Catchment Left Hand, Catchment Right Hand, Catchment Right Hand Rake out strip, Catchment Tray Left Hand Rake out strip, Intermediate Right Hand Rake out strip, Intermediate Left Hand Rake out strip, Ridge Tray, Internal Angle Universal, External Angle Universal, External Angle Universal Rake out strip, Internal Angle Universal Rake out strip, Ridge Tray Rake out strip, Type Z 30mm Cavistrap 2000mm length (50 number), Type D with 25mm insulation 2.4m length, Type D with 50mm insulation 2.4m length, Type V contract closer 2.1m length, Type V contract closer 3.0m length, Type WCA 2.1m length (Please advise cavity width), Type WCA 3.0m length (Please advise cavity width), Cavi60 Type WCA up to 100mm cavity 2.1m length, Cavi60 Type WCA up to 150mm cavity 2.1m length, Cavi60 Type WCA up to 100mm cavity 3.0m length, Cavi60 Type WCA up to 150mm cavity 3.0m length, Cavi240 Type CFIS 1.2m length, Cavi120 Type LAD Fire rated loft hatch, Type N sitesealer edge tape 30m x 100mm, Type N sitesealer membrane 30 sq metres, Air Brick Terracotta, Air Brick Beige, Air Brick Brown, Air Brick Slate, Air Brick Black, Air Brick White, Air Brick Black (100 number), Air Brick Slate (100 number), Air Brick Brown (100 number), Air Brick Beige (100 number), Air Brick Terracotta (100 number), Air Brick White (100 number), Rectangular to round adaptor, Cranked telescopic sleeve, Cranked telescopic sleeve (20 number), Vertical extension sleeve for cranked ventilator 450mm long, Vertical extension sleeve for cranked ventilator 300mm long, Horizontal extension sleeve for cranked ventilator 600mm long, CSV White, CSV Brown, CSV Black, CSV White (50 number), CSV Brown (50 number), CSV Black (50 number), CRSV Brown, CRSV Black, CRSV Brown (50 number), CRSV Black (50 number), Corbel vent 2400mm length White, Corbel vent 2400mm length Brown, Corbel vent 2400mm length Black, Eaves comb filler 1000mm length, Eaves comb filler 1000mm length (200 number), Eaves roll out ventilator 400mm wide (1 Roll), Eaves roll out ventilator 400mm wide (10 rolls), External roof ventilator small, External roof ventilator large, Open eaves vent flyscreen 400mm centres, Open eaves vent flyscreen 450mm centres, Open eaves vent flyscreen 600mm centres, Open eaves vent flyscreen 400mm centres (25 number), Open eaves vent flyscreen 450mm centres (25 number), Open eaves vent flyscreen 600mm centres (25 number), Over fascia vent 1000mm length Black, Over fascia vent 1000mm length White, Over fascia vent 1000mm length White (50 number), Over fascia vent 500mm length Black, Over fascia vent 500mm length Black (25 number), Panel ventilator 400mm centres, Panel ventilator 450mm centres, Panel ventilator 600mm centres, Panel ventilator 400mm centres (25 number), Panel ventilator 450mm centres (25 number), Panel ventilator 600mm centres (25 number), Reversible angle soffit vent length White, Reversible angle soffit vent length Brown, Reversible angle soffit vent length White (10 number), Reversible angle soffit vent length Brown (10 number), Roof abutment ventilator 1200mm length, Roof abutment ventilator 1200mm length (10 number), Refurbishment eaves vent 400mm centres, Refurbishment eaves vent 450mm centres, Refurbishment eaves vent 600mm centres, Refurbishment eaves vent 400mm centres (50 number), Refurbishment eaves vents 450mm centres (50 number), Refurbishment eaves vents 600mm centres (50 number), Flush Slate ventilator 600 x 300mm, Flush Slate ventilator 500 x 250mm, Adaptor for Flush Ventilator, Contract Slate roof ventilator, Soil pipe adaptor for Contract Slate, Soil pipe adaptor to fit Tile vent, Universal roof ventilator for tiled roofs, Strip soffit vent 2400mm length White, Strip soffit vent 2400mm length Brown, Strip soffit vent 2400mm length Black, Strip soffit vent 2400mm length White (20 number), Strip soffit vent 2400mm length Brown (20 number), Strip soffit vent 2400mm length Black (20 number), Strip soffit vent reduced upstand 2400mm White, Strip soffit vent reduced upstand 2400mm White (20 number), Strip soffit strip wide 2400mm length White, Strip soffit vent wide 2400mm length Brown, Strip soffit vent wide 2400mm length White (10 number), Strip soffit vent wide 2400mm length Brown (10 number), Strip soffit vent flat 2400mm White, Strip soffit vent flat 2400mm Brown, Strip soffit vent flat 2400mm White (10 number), Strip soffit vent flat 2400mm Brown (10 number), Three in one ventilation pack, Universal soffit vent 2400mm length White, Universal soffit vent 2400mm length Brown, Universal soffit vent 2400mm length White (10 number), Universal soffit vent 2400mm length Brown (10 number), Vent pack No.1, Vent pack No.2, Vent pack No.3, Ventilated Flashing – pack containing 3 number 1200mm lengths, Type W Weepvent Grey, Type W Weepvent Translucent, Type W Weepvent White, Typw W Weepvent Terracotta, Type W Weepvent Beige, Type W Weepvent Brown, Type W Weepvent Black, Type W Weepvent White (50 number), Type W Weepvent Terracotta (50 number), Type W Weepvent Beige (50 number), Type W Weepvent Brown (50 number), Type W Weepvent Black (50 number), Type W Weepvent Grey (50 number), Type W Weepvent Translucent (50 number), Type W weep extension duct, Type W weep extension duct (50 number), Render cover for Type W weepvent (box of 50 number), Continuous running soaker strip 3000mm length, Eaves continuous slate course 3000mm length, Contract Hardedge 1500mm length, Plywood top for Type I 2400mm length, Type I in screed duct 2400mm length, Loft access door 720 x 565mm, Roof bonding strip 3000mm length, Valley gutter for slates 3000mm length, Valley gutter for tiles 3000mm length, Stip soffit vent general purpose 2400mm White, Strip soffit vent general purpose 2400mm Brown, Strip soffit vent general purpose 2400mm Brown (10 number), Strip soffit vent general purpose 2400mm White (10 number), Through wall cavity sleeve 9 x 6, Through wall cavity sleeve 9 x 3, Through wall cavity sleeve 9 x 9, Cranked telescopic sleeve to round connector, Soffit Strip Length – Caramel Brown, Box of 20 number lengths – Caramel Brown, Left, Right, Left, Right, Left, Right, Left, Right, Left, Right, Left, Right, Left, Right, Left, Right, Left, Right, Left, Right, Left, Right, Left, Right, Ridge Tray, Ridge Tray, Internal Corner Left, Internal Corner Right, External Corner Left, External Corner Right, External Corner Left, Internal Corner Left, External Corner Right, Internal Corner Right, External Coner Left, Internal Corner Left, Internal Corner Right, External Corner Right, Ridge Tray, Ridge Tray, Ridge Tray, Ridge Tray, External Corner Left, Internal Corner Left, External Corner Right, Internal Corner Right, Internal Corner Left, External Corner Left, External Corner Right, Internal Coner Right, External Corner Left, Internal Corner Left, External Corner Right, Internal Corner Right, TIMLOC circular soffit vents in brown (500 number), Flyscreen cross flow ventilator 600mm centres (Box of 500), Lead Cone Slate 3" pipe, Type FB14 Box profile flashing unit, Type FB14 Box profile flashing unit (50 number), SPEP 55mm, SPEP 75mm, SPEP 110mm, SPEP 130mm, Soffit Venting Strip – White, Soffit Venting Strip – Brown, Soffit Venting Strip – Black, Soffit Venting Strip – White, Soffit Venting Strip – Brown, Soffit Venting Strip – Black, Circular recessed soffit vent – Brown, Circular recessed soffit vent – Black, Circular recessed soffit vent – Brown, Circular recessed soffit vent – Black, Eaves Comb Filler 1000mm length, Eaves Comb Filler 1000mm length, Contract Hardedge 1200mm, Contract Hardedge 1200mm (10 number), FWC Five Width Closer (10 number x 2.4 metre pack), Cavi 60 Fire Rated Loft Hatch, Cavi 60 MWR cavity stop sock 1.2m length, Strip Soffit Ventilator Black – 1 number, Strip Soffit Ventilator Black – 10 number, Refurb Eaves Vent Size 2 600mm, Refurb Eaves Vent Size 1 400/450mm, Refurb Eaves Vent Size 2 600mm (50), Refurb Eaves Vent Size 1 400/450mm (50), Soffit Ventilator Strip General Purpose Brown, Soffit Ventilator Strip General Purpose White, Soffit Ventilator Strip General Purpose Brown (10 number), Soffit Ventilator Strip General Purpose White (10 number), Perform Adhesive 290ml tube, Perform 150mm wide x 4m roll Terracotta, Perform 150mm wide x 4m roll Grey, Perform 150mm wide x 4m roll Black, Perform 250mm wide x 4m roll Terracotta, Perform 250mm wide x 4m roll Black, Perform 250mm wide x 4m roll Grey, Perform 300mm wide x 4m roll Terracotta, Perform 300mm wide x 4m roll Grey, Perform 300mm wide x 4m roll Black, Perform 450mm wide x 4m roll Black, Perform 450mm wide x 4m roll Terracotta, Perform 450mm wide x 4m roll Grey, Perform 600mm wide x 4m roll Terracotta, Perform 600mm wide x 4m roll Grey, Perform 600mm wide x 4m roll Black, Perform 1250mm wide x 4m roll Terracotta, Perform 1250mm wide x 4m roll Grey, Perform 1250mm wide x 4m roll Black, Double Side Tape 50mm x 15m, Sitesealer Edge Tape 100mm x 30m, Pyramid Weep 100mm – Size 1, Pyramid Weep 240mm – Size 2, Gas Reception Sump, Type V 170 x 2.1m Length, Type V170 x 3.0m Length

Based on 0 reviews

0.0 overall
0
0
0
0
0

Be the first to review “Type X Catchment Cavitray 43.5-70 Long Lead Flashing”

There are no reviews yet.

SHOPPING CART

close